AN EVALUATION OF FACTORS AFFECTING MATERIALS MANAGEMENT IN CONSTRUCTION SITE, A CASE STUDY OF IMO STATE
Get complete chapters, abstract, references and questionnaire delivered to your WhatsApp or email.
CHAPTER ONE
INTRODUCTION
1.1 Background
of the Study
Material
management can be defined as a process that coordinates planning, assessing the
requirement, sourcing, purchasing, transporting, storing and controlling of
materials, minimizing the wastage and optimizing the profitability by reducing
cost of material. Baldva (1997) noted that Materials management is a process
for planning, executing and controlling field and office activities in
construction. While Eduardo (2002) viewed Materials management as the system
for planning and controlling all of the efforts necessary to ensure that the
correct quality and quantity of materials are properly specified in a timely
manner, are obtained at a reasonable cost and most importantly are available at
the point of use when required.
According
to Khyomesh and Chetna, (2011) Building materials account for 60 to 70 percent
of direct cost of a project or a facility, the remaining 30 to 40 percent being
the labour cost. Therefore, efficient procurement and handling of material
represent a key role in the successful completion of the work. It is important
for the project manager to consider that there may be significant difference in
the date that the material was requested or date when the purchase order was
made, and the time at which the material will be delivered. These delays can
occur if the contractor needs a large quantity of material that the supplier is
not able to produce at that time or by any other factors beyond his control.
Chan (2002) noted that the project manager should always consider that
procurement of materials is a potential cause for delay. The management of
Construction processes to reduce, reuse, recycle and effectively dispose of
wastes has a serious bearing on the final cost, quality, time and impact of the
project on the environment. (Dania, 2007)
The
goal of materials management is to ensure that construction materials are
available at their point of use when needed. The materials management system
attempts to ensure that the right quality and quantity of materials are
appropriately selected, purchased, delivered and handled on site in a timely
manner and at a reasonable cost, (khyomesh and chetna 2011). The scope of
materials waste is vast, and this waste occurs in the industry irrespective of
the size of the building firm, instructions about handling, storage and
stacking are not provided with the goods or sent in advance to the site
(Abdulazeez, 2000).
Materials
management in construction is also regarded as the efficient use of goods and
equipment before, during and upon completion of a building process. Petra
(2013) observed that Successful materials management requires the participation
of all persons involved in a construction process. For Materials may
deteriorate during storage or get stolen unless special care is taken. Delays
and extras expenses may be incurred if materials required for particular
activities are unavailable. Ensuring a timely flow of materials is an important
concern of material management (Shah, 1993).
Thus,
Materials management is an important element in project management. Materials
represent a major expense in construction, so minimizing procurement costs
improves opportunities for reducing the overall project costs. Poor materials
management can result in increased costs during construction. On the other
hand, efficient management of materials can result in substantial savings in
project costs. If materials are purchased too early, capital may be held up and
interest charges incurred on the excess inventory of materials (Wendy, 2006).
Johnston
(2001) opined that Material Management is divided between head office and site
in major construction companies. The selection, pricing, ordering, preparation
of schedules and payment accounts are dealt with at head office, learning the
receipt storage, protection and use of materials to management on site. Due to
the high cost of materials, if not properly managed during the period of
execution of contract can lead to abandonment of project.
In
his submission, lan (2008), opined that the rate at which materials are been
squandered on site due to poor management is getting too rampant in our society
and if not curbed, it can jeopardize the future of our construction industry.
This is particularly true in view of the fact that mismanagement of
construction resources (i.e materials, plants and labour) affects the
continuity and profit margin of such project and if not checked can lead to
technical insolvency or bankruptcy.
Therefore,
attention must be paid to how materials are been procured, stored and managed
in order to achieve perfect work, effective handling of materials, right usage
of materials and control of construction resources.
This,
explain the reason why Johnston (2001), noted that Materials management begins
with planning and estimation, these can be achieved through proper site
co-ordination measure of reducing wastes, the location and security of
materials on sites, procurement of quality materials as being specified and
effective administration of site together with quality control.
Lee
and Donald (2001), observed that the problem associated with the absence of
proper materials management on construction site could be wastage of resources
making contract cost more than budget sum, reduction of profit margin of the
contractor ineffectiveness of project handlings reduction of output etc. and if
these are not properly taken care of it might be disastrous to the firm.
No
construction project can commence and proved effective without an adequate
supply of raw materials, apart from the careful planning of materials required
by the builder, it is to his advantage to foster a good relationship with the
suppliers, many of whom will have been selected due to their fulfillment of
orders to the standard required and meeting of delivery times over a number of
years (Pheng and Chuan, 2001).
Besides
the builder’s own suppliers, the architect may specify that a certain supplier
must be used and these are termed “nominated supplier” whatever the type of
suppliers to be used, the information passed to them and receive from them is
the same and in all but in the smallest firms this information and document
will pass through the buyer. (Yang, et al., 2003).The buyer must also ensure
that the architect receives any samples from the suppliers in the very early
stage of contract procedure to satisfy him of the relative merits of the
material. It may, for example, not be possible to obtain the specified material
in time in conjunction with the building programme, but by obtaining samples of
similar products the architect may decide on a new form of construction or
design to prevent hold ups.
In
most cases, a buyer will send enquiries to two or three suppliers or in some
cases, direct to manufacturers for such items as sand, gravel, brick, block,
cement etc., regarding prices, delivery dates and such, for use at the
estimating stage of the project. This will enable the estimator to use the
figures obtained in the preparation of the tender figure.
To
enable quick checks to be made on delivery or non-delivery of materials a card
index system is generally adopted, this enables the purchasing or procurement
department to keep a constant eye on the supplies. These cards contain all
necessary information and are best filed in date offer for case of reference.
Even when bulk delivers have been placed according to programme, by taking the
extra time and trouble to write out a card for each delivery the chance of
losing sight of the delivery date is very much reduced, as regular checks will
be on the file. As materials are received, the information will be recorded on
the card.
Construction
projects can be accomplished by utilizing management processes and these
processes include planning, organizing, executing, monitoring, and controlling
(Ahuja et al 1994 in Al Haddad 2006). During any construction project the three
inter-related factors of time, cost, and quality need to be controlled and
managed. Successful completion of projects requires all resources to be
effectively managed. Prabu and Baker, (2006) regard Materials management as a
means to achieve better productivity, which should be translated into cost
reduction. For, according to Ademeso and Windapo (2008), poor planning and
control of materials, lack of materials when needed, poor identification of
materials, re-handling and inadequate storage cause losses in labor
productivity and overall delays that can indirectly increase total project
costs. Effective management of materials can reduce these costs and contribute
significantly to the success of the project.
Materials
management functions include planning and taking off materials, vendor
evaluation and selection, purchasing, expenditure, shipping, material
receiving, warehousing and inventory, and material distribution. (Narimah
2011), Almost 60% of the total working capital of any industrial organization
consists of materials costs (Dey, 2001). Materials management can only produce
what it should with the right quantities of the right material at the right
time (Arnold and Chapman 2004). Thus, any improper handling and managing of
materials will cause a huge effect on the total project cost, time and quality.
There is a need to explore on the area of materials management, the issues
relating to materials management problems
1.2 Statement
of Problem
The
present state of the building construction industry in Nigeria reflects various
problems ranging from delays in project execution/delivery, substandard work,
disputes, to cost and time overrun as a result of material shortage and
wastages on sites, theft and displacement of materials on sites, as well as
poor accounting and security system of the concerned sites/firms (Adafin,
2011). According to Dahiru (2010), lack of materials not only causes delays,
but a consequent decrease in productivity and resulting to cost overruns. This
is no doubt lack of effective material management is one of the major cause of
this problem. Failure of the project manager to make available materials need
could lead to delay. Non-compliance strictly with project bill of quantities,
schedule of materials, specifications and construction programme in material
stock control practice is another contributing factor which tends gradually to
decrease profitability of a project also often leads to extension of time
respectively, and hence no proper material stock control practice (Inyang Udoh,
2002). Besides that, Dey (2001) noted that the rate at which materials are
being wasted due to improper management is becoming unbearable to the
contractors due to its effect on their profit margin and proper usage of
material to achieve quality job been done through various techniques.
1.3 Research
Objectives
The
aim of the research is to evaluate factors affecting material management in
construction sites in Imo State in Nigeria with a view to proffering solutions
to the identified problems.
The
specific objectives of this research are;
1. To establish theoretical frame work on
construction materials management.
2. To study the practices of construction
material management by construction firms in Imo State
3. To investigate the factors militating
against effective materials management on construction site in Imo State
4. To assess professionals perception on
the measures to be put in place to ensure effective materials management in the
construction industry in Imo State.
1.4 Research
Questions
The
following are the research questions as related to this study.
1. What are the principle and procedures
of good materials management?
2. What is the current practice of
materials management in Imo State?
3. What are the factors militating against
materials management on construction sites in Imo State?
4. What are the measures to be put in
place to ensure effective materials management on construction sites?
1.5 Significance
of Study
A
major part of professional builder’s responsibility in building production
management entails the selection, purchase, testing, storing and use of
construction materials. As noted earlier, materials are a major expense in
construction, thus the ability of contractor to manage his team and the flow of
supplies are absolutely necessary for the successful project delivery and
profit maximization. This requires the architects and engineers to specify
exact supplies during pre-construction to avoid overstock. The construction
management team is required to buy the correct amount of material at the right
time to avoid cash flow, storage and deterioration problems. Subcontractors
need to keep track of inventories, while suppliers are required to deliver as
ordered and on time. The post-construction team has to evaluate remaining
materials for reuse and recycling purposes.
However,
this is not easy; First, if materials are purchased early, capital may be tied
up and interest charges incurred on the excess inventory of materials. Even
worse, materials may deteriorate during storage or be stolen unless special
care is taken. For example, electrical equipment often must be stored in
waterproof locations. Second, delays and extra expenses may be incurred if
materials required for particular activities are not available. Accordingly,
ensuring a timely flow of material is an important concern of project managers.
(Harris and MacCaffer, 2001)
Thus,
to determine the misery behind proper materials management in construction
sites in Nigeria, so as to guide against project delay and abandonment, also to
create a standard method based on size of construction site to control cost of
contract and materials wastage. It is not only desirable but necessary to
undertake careful study of material management. Additionally, since Proper
material management will benefit the firm in terms of increase profit margin,
quick execution and reduce cost of the project. This brings the need for an
evaluation of materials management in Nigeria construction industry.
1.6
Scope and Limitation
This
work focused on materials management practices in construction sites. The study
covered factors militating against materials management, measures for effective
materials management on construction firms. The study was limited to only
building construction sites in Imo State; therefore not all the country was
covered.
1.7 Operational
Definition of Terms
Material Management: is a scientific technique, concerned with Planning,
Organizing and Control of flow of materials, from their initial purchase to
destination. It can also be seen as an approach for planning,
organizing, and controlling all those activities principally concerned with the flow of materials into an organisation.
Construction Site: this refers to the piece of land where a building,
etc, is to be located. A building site is an area of land on which a building
or a group of buildings is in the process of being built or altered. A
construction site may be construction other than buildings, e.g. Road
construction, landscaping.
This project contains full academic material including literature review, methodology,
data analysis and conclusion.